|
|
|
City of Boulder Storm Water Quality Program |
|
Boulder Creek Watershed
Specific Conductance Time Series for 2000 Boulder Creek at Orodell |
Preliminary Data - subject to revision
|
|
|
 |
Indicates no data available |
Indicates data exceeds plot scale. |
|
|
Information on Specific Conductance:
Specific Conductance
is a measure of how well water can pass an electrical current. It is an indirect measure of the presence of inorganic dissolved solids, such as chloride, nitrate, sulfate, phosphate, sodium, magnesium, calcium, and iron. These substances conduct electricity because they are negatively or positively charged when dissolved in water. The concentration of dissolved solids, or the conductivity, is affected by the bedrock and soil in the watershed. It is also affected by human influences. For example, agricultural runoff can raise conductivity because of the presence of phosphate and nitrate.
|
|
More general information about Specific Conductance
|
|
|
Interpretation of Boulder Creek Specific Conductance data
|
|
|
|
Monitoring site information: |
|
|
- Location: Boulder Creek at Orodell
- Name: BC-ORO
- Type: Composite
- Frequency: Monthly
- Longitude: 105 ° W 19'
- Latitude: 40 ° N 85'
- Elevation: 5825 feet asl
- Site photo
|
|
| Downstream Site: Boulder Creek at Eben G. Fine Park |
| Upstream Site: North Boulder Creek at Boulder Falls |
|
| Plot Label |
Date |
SC µ mhos/cm |
| 01 |
January, 2000 |
56 |
| 02 |
February, 2000 |
56 |
| 03 |
March, 2000 |
80 |
| 04 |
April, 2000 |
84 |
| 05 |
May, 2000 |
48 |
| 06 |
June, 2000 |
26 |
| 07 |
July, 2000 |
28 |
| 08 |
August, 2000 |
26 |
| 09 |
September, 2000 |
47 |
| 10 |
October, 2000 |
54 |
| 11 |
November, 2000 |
No Data |
| 12 |
December, 2000 |
No Data |
| *value below detection limit: |
|---|
| Detection Limit (if available) |
1.0 |
|---|
|
Preliminary Data - subject to revision
|
|
Select on the parameter name to view all Specific Conductance time series plots on the basin map.
Select on the table date to view stream Specific Conductance profiles observed on that date.
Select here to view all parameters at this site.
|
Thank You!
BASIN was a community project which benefitted from over 1000 hours of
public volunteer time. BASIN was highlighted by the US EPA
in a national case study in its 2001 handbook Delivering Timely Environmental Information to Your Community.
Thank you to all volunteers, and especially to the late Jim Waterman, BASIN Project Coordinator!
|
|
Home
| Site Map
| Glossary
| Bibliography
| Contributors
About BASIN
| Attribution
| Feedback
| Search
|